HSE Equipment & Intervention Engineer 04/2019 - current
Total Energies Nigeria, Lagos, Nigeria Nigeria
Industry: Oil & Gas
A commercially astute Health, Safety & Environmental (HSE) Engineer with a record of driving safe working practices gained about 15 years within the Oil & Gas sector with proficiency in worksite assessment and hazard controls, Safety Standards and regulatory compliance, Intervention Management, HSE Monitoring, Audits &Investigation,loss prevention and controls etc. Has additional expertise in safety equipment maintenance and management and holds a BEng degree and various trainings and skills. Demonstrates an in-depth knowledge of construction management and requirements.
Intervention - Safety Equipment Preparations
My Scope covers responsibilities for all maintenance activities that have to do with Safety equipment (Oil Spill equipment and containers, personnel frog, scramble nets, life rafts, fire hydrants, life buoys, life jackets. smoke hoods, fire extinguishers, safety shower and eye wash stations, fire monitors, Lifeboats, and escape boats, etc.)
Developed all the procedures for the services and maintenance of all the safety equipment (s) of Akpo FPSO and demonstrated viability of all the procedures
Ensured that PTW's are properly prepared, validated, and ready ahead of mobilization datelines
Carried out inspections of life jackets and subsequent recertification annually
Inspected life rafts, checking service status, and ensuring that applicable tests (Working pressure, Gas inflation, NAP, FS and Load tests where applicable) are conducted- followed by replacements of expired items within
Performed compliance tests on safety shower/ eye wash, ensured cleaning and necessary adjustments
Ensured that oil spill response equipment will function as desired by performing preventative maintenance on engines, testing the reel system, integrity checks
Performed functional tests on water hydrants
Participated in the functional testing of fire monitors
Lifeboat’s maintenance / reliability – monthly, yearly and 5 yearly checks
Followed up with manufacturers’ representatives on periodic inspections, maintenance & tests of all lifeboat-
Carried out inspections and services on fire extinguishers and subsequent annual recertification
Proposed work program and prepares scope of work for all safety equipment
Took leadership to carry out all the work preparation for Safety equipment including Work pack, PTW, SAP Work Order preparation, JRA, Procedures, Work Plan, Site Kick Off Meeting, etc. to ensure proper execution of Safety equipment Maintenance Campaigns.
Acted as the Performing Authority (PA) and led the execution of all maintenance campaigns on all safety equipment on site,
Ensured that Daily Reports are issued for all ongoing campaigns on site for safety equipment,
Followed up and ensured physical supervision of all contractor activities involving repairs and recertification of safety equipment belonging to Company
Consulted with Original Equipment Manufacturers on Safety Equipment.--
HSE Supervisor 10/2010 - 04/2019
Total Energies Nigeria, Port harcourt, Rivers state Nigeria
Industry: Oil & Gas
OML 100 FSO Unity Oil Water Upgrade Project: Module construction, heavy lift operation, hook-up, and Integration
OML 130 Akpo FPSO FFSD
OML 102 Ofon Phase 2 Project (hook up, OFP2 Platform Integrations & tie-in); Ofon OFP1 platform modification -OFD1 extension & shutdown; D3 and D5 Platforms fabrication& jacket legs fabrication installation
OML 130 Egina FPSO Topside fabrication, integration & hook up
NOPL Pipeline construction project
Facility safety operation and marine; shutdown coordination; maintenance, modification, and upgrade projects
Ensured full understanding of the exhibit L and followed up its implementation to the letter
Reviewed exhibit L, on HSE input during bidding and tendering phase
Participated in contractors HSE yard evaluation and subsequent mobilization plan
Confined space jobs management- tank entry job activities and permit issuance, operation, and closeout- continuous monitoring of atmosphere-
Review and oversee rescue plans
Monitored and reported HSE performance of the project.
Participated in the promotion of Total E & P’s “12 Golden Rules” and “HSE Policies” in words and actions
Permit To Work Controls Systems: issuance, operations, and close-out
Devised extra measures and focus on potentially risky activities (including but not limited to work at height/inaccessible locations, confined space entry, lifting operations, high pressure activities and rigging especially in live facilities)
Inspected rigging materials and ensured the proper storage after use
Conducted scaffolding inspections and audits
Identified the need for extra resources based on changing work scope and communicated same to project team and management for appropriate action
Participated in Risk Assessment and Safety Analysis studies associated with construction operations and ensure they comply with company's requirement.
Conducted regular site HSE audits & inspections and ensured corrective action recommendations are conclusively closed out.
Bore in mind Company’s HSE plan and ensured its full adaptation to the needs of each worksite and proposed additional measures to address specific HSE challenges
Proactively identified possible HSE deficiencies and intervened with supporting reports
Participated in the implementation of the incident / accident management system (investigation, report analysis, recommendations, development, of corrective action plans and monitoring implementation.
Participated in the site emergency preparedness and followed-up improvement measures undertaken after the regular drill/exercise.
Arranged and participated in toolbox meetings drills and trainings
Checked that first aid materials and HSE equipment are available on site
Submitted daily and weekly HSE reports to manager mentioning areas of concerns
Organized and participated in HSE meetings and delivered in-house HSE trainings for all staff--
Company Site Rep 12/2006 - 09/2009
Alcon Construction Nigeria ltd, Port harcourt, Rivers state Nigeria
Industry: Construction
SPDC- AFAM F5 Project Facility Development - Expansion of the AFAM F5 project facility-
Construction works (Civil and Structural Prefabrication, Mechanical, Piping, Electrical and Instrument Storage Tanks, Rotary / Static Equipment Shelter, Road, Fence , Insulation and Cathodic Protection, two (2) Nos. Compressors - 2 stage single acting reciprocating compressor- E-16618AVO18
SIEMENSVI Lagos- Azura Edo Power Plant-Mechanical Erection for Piping and Turbine Works; Erection of Turboset, Power Plant Equipment, Structural and Piping Works
At the top of construction activities, expediting and ensuring that all necessary approvals that pertains construction/project activities are gotten from internally and externally and on time - including permit to work, approved drawings, procedures, and safety evaluations (JSA, JHA) etc.
Ensured appropriate resources are allocated to the construction activities.
Identified deficiencies, issues/problems that cause delays, recommend solutions and drive approved remedial actions.
Implemented and managed project changes and interventions to achieve project outputs.
Updated daily and weekly progress report, capturing man-hours for every module job.
Ensured the quality records, acceptance certificates, mechanical completion certificates and the documentation for specific systems and buildings/areas are prepared and collated in accordance with project requirements.
Ensured strict compliance to the projects Inspection and Test Plan (ITP), identifying hold points, and communicating same to the contractors and Welding Inspectors on site to ensure total compliance.
Organized and manage welding and fabrication team.
Coordinated with the site QC manager for the completion of as-built turnover documentation
Resolved any discrepancies between the completed milestone and quality documentation
Ensured construction activities are in line with approved procedures.
Plan and coordinate site activities to meet company objectives with respect to time, cost and quality.
Tracking and regular reporting of positions of all company items from Purchase Order stage to handover--
Federal University of Technology, Owerri, Imo state Nigeria 09/1998 - 03/2005
Owerri, Imo state, Nigeria
Degree: Bachelor's Degree
Major:Metallurgical/Materials Engineering
Obtained a Bachelor degree in Metallurgical/ Materials engineering with a second class upper division
Login to view resume: Resume - HSE Engineer