Project Manager 04/2016 - current
NGM Company Ltd, Nairobi, Nairobi Kenya
Industry: Electrical
132kV Transmission Line - replac-ing earth wire to OPGW – 400km.
132kV Transmission Line Founda-tion Works – Kisii - Awendo
Mount Kenya 33/11kV Substations and Associated Lines.
33kV Lines – 60Kms
11kV Lines – 40Kms
4 No’s new 33/11kV Substations & 3 Bay Extensions in 132kV substa-tions.
Project/Assignment:
132kV Transmission Line - replacing earth wire to OPGW – 400km.
132kV Transmission Line Foundation Works – Kisii - Awendo
Mount Kenya 33/11kV Substations and Associated Lines.
33kV Lines – 60Kms
11kV Lines – 40Kms
4 No’s new 33/11kV Substations & 3 Bay Extensions in 132kV substations.
Activities included:
Developing a 33/11kV Substations and associated Lines project execution plan for the overall projects.
Development of scope of work and Conceptual design for modifications to existing and new substations
Developing overall construction sequence for the Projects. Perform substation constructability reviews during design phase.
Factory Acceptance Test for 7.5MVA power Transformers, CT’s & VT’s.
Oversight of the development and review of all specifications to support request for proposals. Review and evaluate all bids for materials, equipment and services.
Assist Project procurement personnel in the negotiation of all substation contracts.
Oversight and management of all contractors, equipment and services providers to ensure that safety, quality, cost and schedule expectations are met.
Manage all substation and lines change orders and develop Work Plans (switching & tagging) for substation conversions and additions.
Invoice follow-up from clients and coordination so as to receive and enable receipt of funds & sustain Project cash flow
Keeping track of outstanding works and review, reconciliation, by interacting with Contractors &in house team.--
Project Manager - T & D Projects 04/2011 - 03/2016
Aster Pvt Ltd / AISL, Abuja, Abuja Nigeria
Industry: Electrical
132 kV Double Circuit Transmission Line Keffi-Kwoi-Kachia (137KM) – Lot 4.
132 kV Double Circuit Transmission Line Ganmo – Shonga (120KM) – Lot 7.
Planning & scheduling the 132kV EHV Transmission Lines projects activities & handling the complete cycle of the project management which includes: Planning, Organiz-ing, and managing resources up to final closure of project.
Negotiating with subcontractors for the finalization of various subcon-tracts.
Coordinating with various sub-contractors for planning & schedul-ing the project activities so that smooth & timely execution can be achieved.
Coordination with clients and Project consultant regarding all the activities of the project ensuring timely getting of statutory approval of designs, drawings, quality plans, safety plans and reporting the overall progress of the project.
Coordination with Design depart-ment so as to address issues of concern in relation to Technical Standards & obtain approvals from end client.
Good experience in Factory Acceptance Test of Transmission line towers (Transmission Company of Nigeria 132kV Towers 25 Nos, Ghana 4Nos & Nepal 5Nos).
Lab tests for materials used in con-struction like cement, steel, con-crete cubes, sand, gravel and wa-ter.
Conducting Check survey and cor-recting of Tower locations which falls in difficult terrains to access, prepare & approval of required access road maps.
Coordination of way leaves (right of way acquisition) operations. Fabrication of form boxes, Jacks locally for foundationworks.
Handled all the documentation re-lated to the Project and supporting F&A in timely submission of in-voice.
Invoice follow-up from clients and coordination so as to receive and enable receipt of funds & sustain Project cash flow
Responsible for Site Inventory Management.
Planning & controlling team of en-gineers & supervisors to ensure site activities is in full safety prac-tice.
Keeping track of outstanding works and review by reconciliation and in-teracting with Contractors &in house team.
Assist in the energization and commissioning of EHV Transmis-sion lines.--
Deputy Project Manager 04/2009 - 03/2011
GVPR Engineers Ltd, Hyderabad, Telangana India
Industry: Electrical
400KV D/C Transmission Line Malkaram – Narsapur – 90KM.
220kV D/C Transmission Line Gattaprabha to Chikodi– 110KM & 220kV Sub Station, GhattaPrabha - Client: KPTCL, INDIA
Planning & scheduling the 400 & 220 kV EHV Transmission and Power Sub-station projects activities & handling the complete cycle of the project management which includes: Planning, Organizing and managing resources up to final closure of the project.
Negotiating with subcontractors for the finalization of various sub contracts.--
Sr.Electrical Engineer 11/2007 - 03/2009
Vijai Electrical Ltd, Hydrabad, Telangana India
Industry: Electrical
400/220KV Substation, Bhandara,
33/11kV Substations (5Nos) and Associated Lines – 350 KM
Planning & scheduling the 400/220 kV EHV Substation Bay Extensions and 33/11 Power Sub-stations projects activities & handling the complete cycle of the project management which includes: Planning, Organizing and managing re-sources up to final closure of project.
Coordination with clients regarding all the activities of the project to ensure timely statutory approval of designs, drawings, quality plans, safety plans and reporting the overall progress of the project.
Action plan of work based out of client funding & develop the budget Plan for the projects and Supporting to Finance Team.
Coordination with Design department so as to address issues of concern in relation to Technical Standards & obtain approvals from end client.
Lab tests for materials used in construction like cement, steel, concrete cubes, sand, gravel and water.
Planning and scheduling of activities like Geo-technical investigation from field work to laboratory test and review of report so as to avoid further discrepancies in foundation classes.
Conducting Check survey and correcting of pole / Tower locations which falls in difficult terrains to access, preparation & approval of required access road maps.
Coordination of way leaves (right of way acquisition) operations.
Responsible for Customer Relation and Coordinating with customer for proper planning & scheduling the project activities.
Planning, controlling and sorting out issues related to liaison and other local problems for project execution.
Responsible for Site Inventory Management.
Planning & controlling team of engineers & supervisors to ensure site activities is in full safety practice.
Preparing MIS, Progress reports and Bar Charts (MS Project) for re-porting & reviewing purpose so that the clear picture of the work progress &bottle necks can be defined.--
Electrical Engineer 05/2006 - 10/2007
IVRCL I & P Ltd, Hyderabad, Telangana India
Industry: Electrical
132kV SC / DC Transmission lines Package 1 - Bhuj-Kutch regions – 250KM;
220kV D/C Transmission Line Un-chahar to Raibareilly - 45KM.
Main project includes: 132 & 220kV D/C Transmission Lines Survey, Installation and stringing.
Foundation works including stub setting and concreting.
Manage the segregation & Stacking of Tower parts at the stores and site. Tower Assemblies and Erection procedures.
Manage and supervise the Tower erection activity, assembly and tightening of nut and bolts for back bolting and inspect the missing parts for implementation.
Inspect the tower parts materials for avoiding any critical missing be-fore stringing activity.
Prepare conductor setup plan with proper drum lengths.
Measure proper safety precautions during the Tower erection and stringing activities.
Tower Grounding materials installation team and do the required resistance measurements before Earthwire Stringing works.
Manage the insulator assembling fittings and hosting as per H/W assembly drawings as per standard.
Supervised the stringing of Earth-wire, work at the site includes pulling of the Earthwire, sagging of Earthwire of 132 & 220kV Lines.
Prepare project / accomplishment report to Project Manager.
Coordination with Project Manager for the site works, tools purchases and hiring the required machines and equipment for site activity.--
AUCET / JNTU 06/2000 - 04/2004
Hyderabad, Telangana, India
Degree: Bachelor's Degree
Major:Electrical and Electronics Engineering
Electrical Engineering