Highlights:More than 14 years’ experience in Oil and Gas project as Piping Design Engineer, Field engineer Project Engineer. Development project in Basic and FEED, Construction and Installation in Brownfield both Onshore and Offshore. Core Competencies ? Developing General arrangement and piping layout 3D & 2D models with datas input (operation, Maintenance, safety, construction) ? Certified 3D piping design PDMS, Cadworx, Autocad, Navisworks viewer ? Basic knowledge in upstream crude oil process ( Gas & PCP wells, Flowline, manifold, multiphasic separation) ? Good Knowledge of codes and Specifications ( ASME B31.3; ASME B31.4; Total GS PVV; Total GS PLR) ? Design Optimization and problems solving with hard working, alternative design ? Scheduling stage of the piping design to decrease shutdown (TIE-IN, Shutdown works, and Work after Shutdown). ? Define and list Long Lead Items (LLI) to meet the requirements of the planning and launch the supplies. ? BOSIET/Approved Offshore Medical
Skills:piping, valve, design, project, drafting, engineering
Goal:To be the best at what I do.
Membership:AACE PMI
Certification:Project Management Professional Certified Trainer Clock Spring Composite product PDMS Piping Design Management System 12.1 SP4
Senior Piping and Execution Engineer 09/2019 - current
Ambatovy Joint Venture, Tamatave, Madagascar
Industry: Mining
P EXCELL Project
The PEXCELL.P1 Project is a reliability driven project that aims to change the piping in 26
Subsystems of the PAL (Pressure Acid Leach) section of the Processing Plant from Carbon Steel
Rubber Lined Existing Piping to High Quality Alloy Piping in areas 3200, 3300, 3400, 3500, 3600
? Develop Basic Engineering for Piping Scope including:
? Analyzing Inspection report to identifying critical sub-system and piping to change
? Issue Mark-up PID and set-up battery limit of scope
? Scheduling all stage of work ( Work without Shutdown, TIE-INS, Shutdown) to minimize MAOP
? Issue preliminary Bill of Material and data ( Di-inch, Scaffolding, Support) to Cost estimation
? Prepare all documentation to launch Bid or RFQ--
Senior Piping Engineer 09/2013 - 08/2019
Total, Port-Gentil, Gabon
Industry: Oil & Gas
In Project and Construction department, my role begins as soon as the Statement of Requirement
for all revamping projects: Developing the detailed Engineering with multi-disciplinary specialties ( Process,
Electrical, Instrumentation, Civil).
Review, approve ( PRODOM) all piping design and engineering documentation issued by Engineering
contractor and construction contractors like: technical specification, general arrangement, PID, piping
layout, MTO, BOQ, isometrics, Data sheet, and requisition for equipment.
Goals Achieved
? Improvement followed extra work and claim with insertion column on MDR (Master
Document Register) scheduled time and realized
Mains Projects
? ATORA Connection Oil Wells 12 &13 ( onshore site)
? Design General arrangement of well pads ( Layout, plot plan)
? Design skid packages (Pig launcher, ESDV skid, Manifold): piping layout 3D
model, Isometrics, support, Material take-off, piping line list, data sheet of
valves.
? Piping Stress analysis of Flow line, gas lift, production and test manifold.
? Installation of trunk line 6km ,4 inches Coating carbon steel pipeline to
Production plant--
Project Engineer 09/2010 - 08/2013
Construction Contractor PETRO TP, Port-Gentil, Gabon
Industry: Construction
In sub-contractor Construction, I ensured good running and the relation with Oil &Gas clients for all
construction projects (Piping, Civil works, instrumentation).
Coordination of Engineering, procurement,Fabrication and Installation Teams and EI; NDT; Painting
Contractors
Manage meeting with clients , reporting and planning in charge of all technical subject)
Analyzing Technical choice and construction strategy of project (Work Breakdown Structure, Long
lead Item, Type of contract Lump sum or Reimbursable)
Goals Achieved
Improved turnover from K$ 2.500 to K$ 8.620 in three years.
? Setting up an Technical quantitative analysis board , updating the price schedules and cost
allocations board by activities
Major Project
EPC :GAS supply power plant ALENAKIRI (Libreville, Owner PERENCO Oil &Gas)
Creation of supply unit Gas of the power plant 70MW: Construction and installation of
Letdown system skid, Fiscal metering skid, Sour flare system.--
Project Manager 06/2007 - 07/2010
Group FOSELEV -CTS, Port-Gentil, Gabon
Industry: Construction contractor
EPC : Creation Water Injection in ONAL Field onshore -5000 K€
The purpose of the CT 49 contract was to create the system of water injection on Onal onshore
Field operated by MAUREL &PROM Gabon. The Project consist to laying 32 Km of 12 inches CS
Trunk line with 20 KVA cable and optical fiber, connect 17 Injections Wells pads with 6 Inches CS,
Install 3 electrical Shelters on pads, Pig launcher and receiver with pump manifold injection.
Project Manager, I started by cost estimation and issued technical and commercial
proposals. Participate of all clarifications with client Maurel & Prom .
When we awarded the contract, I implemented general organization chart and Project execution
plan ( WBS, Engineering ,procurement, and construction strategy, Calculation man power, S curve
progress , Safety and quality philosophy , meeting schedule).
Scheduling of activities ( Piping, Instrumentation, electricity, civil)
Keys Project data: 22% of profit, 435000 hours , 0 accident with stoppage of work, 3 Non Compliances--
Piping Design engineer 03/2004 - 05/2007
COMETAL, Douala, Cameroon
Industry: EPC Contractor
In charge of Detailed Engineering and all Piping and structural scope
? Piping Engineer - Construction aviation deposit of Farcha, Chad. – 2007.
Develop basic Engineering with multi-discipline Engineers: Definition of overall
installation (Process, Firefighting, utility), PFD, PID, Issued Data sheet of main
equipment and procurement. MTO 80%, Assist design of piping ( Hook-up, piping
Class, General arrangement).
? Field Engineer/ Construction Coordinator - Construction aviation deposit of
Malabo, Equatorial Guinea. – 2006.
Issue piping layout 2D and AFC isometrics with Autocad 2004. Follow-up of 10000
Inches of carbon steel piping fabrication, Coordination erection of two vertical
welded tanks of 400m³ as per Codres 2001 and pumps. Progress report and meeting
with client . Issue MTO and procurement of all piping material ( pipe, fittings, stud
bolt, gasket). Supervise Hydro-static test, NDT and painting jobs. Pre-com and assist
commissionning, start-up. AS-build Documentation.
? Piping Design Engineer - 2004 to 2006
In charge of all revamping offshore project for Total, I attend the site survey set-up
Issue AFC isometric, 2D piping layout,MTO ASB file.--
Field Engineer 05/2002 - 02/2004
ORTEC Group -Friedlander, Belabo SP3, Cameroon
Industry: EPC contractor
EPC : Construction Pump Station N°3 Belabo - COTCO-EXXEON Mobbil
In charge of above ground Piping, I ensured requisition material( piping fitting and spool) . Checking
piping erection and Issued default task sheet . Identification of Extra work and reporting , and ASbuilt
documentation.
? Supervise Installation underground & above ground Piping
? Piping site modification and Issue As-built
? Requisition of piping material( valve, spool, bolts, fittings)
? Coordination of painting works ( piping, supports, equipment)
? Coordination of insulation works( piping)--
Instittute University of Technology Douala 10/2000 - 10/2002
Douala, , Cameroon
Degree: Associate's Degree
Major:Industrial Engineering
Minor:Maintenance
GPA 3