Bangalore Karnataka, India
Phone: xxx-xxx-xxxx
Email: xxx@xxxx.xxx
Looking For: Technical Manager, Senior Mechanical engineer
Occupation: Architecture and Engineering
Degree: Bachelor's Degree
Career Level: Fully Competent
Languages:
Highlights:
Skills:Product design & development, Side Door,Closure systems, BIW,Door Module,Window regulator,Side Door, Catia, UG NX, Door Module, Window Regulator, Side Door, Latches, Outer handles, BIW closures, Closure mechanism, Frunk Release handle, Release, APQP, PPAP, DFA, DFM, DFMEA, Technical deliverables, Design Review, Project Management, engineering change management
Technical Manager 03/2012 - current
Mercedes Benz R & D India Pvt ltd, Bangalore, Karnataka India
Holding two Individual Patents “Method for providing user-specific settings in a
Vehicle” (UK filing) & “Double L-shape bracket for flush type Outer handle”(German
Filing)
10 + Onsite visits to Mercedes AG GERMANY to Work on BR 167 (New GL-C coupe
(C167)/GL-E(V167)/GL-S(X167)-class) A/C 453 (New Smart),X/V/C 254 (Next Gen
GLC),C/W 174, X/H 244 (A & B Class Electric car), X540 (GLC Electric car) Cars
Development spanning overall ~3.0 Years in Sindelfingen, GERMANY
? Received “Star performer of the year 2018” for MGS role execution (first ever in
Department)
Nature of work: Involved in Product Design & Development (Concept to SOP) of Door
Modules, Window Regulators, Latches, Frunk Release handle, Outer handles, Hinges &
drive systems (All closure Mechanisms) co-ordinations with Supplier & Cross functional
team (Interior/exterior styling,Project, Plant,costing,Packaging,Release..etc) Packaging &
Assembly Criterion studies, Protoparts build and fitment/functional trials, Meeting project
time lines, Part Releases (KEMs) in PLM, Design Release, APQP (MDS), PPAP, DFM, DFA,
DFMEA etc. using Catia V5 & UG NX. Technical mentoring & Guidance to team. Technical
deliverables responsible for team of 5 engineers. Handling of team KPIs (FTC, OTD etc..)
Project Releases as per MDS milestones. Driver of “Team Innovation”.
Excellent Feedbacks received from German Business Partners consistently.
An overview of Projects handled:
? Involved in Packaging study of Door Module, Initial Design Proposals, Part
commonization for derivate carlines, Glass Drop Kinematics, Part Releases in Team
Center, Packaging Study, Module Group Interactions (Door BIW, Door Trim, Wiring
Harness, Styling, Glass & Seals cross-functional Teams), Regular Supplier
Meetings.
Project-1: New Generation Mercedes SUVs GL-C (X254), GL-C LWB (V254) & GL-C
Coupe (C254). Additional Responsibility for Module Group 16 & 13 as MGS
with approx. 10 million euros for all five doors - Mercedes AG, Germany
Duration: 2500 hrs (UG NX & Team Center)
Project-2: Mercedes SUVs GL-E (V167), GL-C (C167) & GL-S (X167) - Mercedes
AG, Germany
Duration: 2500 hrs (UG NX & Team Center)
Project-3: A Class (W177) , B Class (W247), GL-B (X247/243-Electric car) & GL-A
(H247/243-Electric car) MFA-2 platform - Mercedes AG, Germany
Duration: 2500 hrs (UG NX & Team Center)
Project-4: Smart for 2 (A/C 453) - Mercedes AG, Germany
Duration: 2000 hrs (CATIA V5 & Team Center)
? Involved in development support of Framed/Frameless Window Regulator, DFA,
Packaging Studies, Tolerance studies, Issue resolving, Supplier interactions,
Module Group Interactions (Door BIW, Door Trim, Wiring Harness, Styling, Glass &
Seals cross functional Teams), Car Launch (Job-1)
Project-5: Electric cars C/W 174, X/H 244 (A & B Class Electric car), X540 (GLC
Electric car) - Mercedes AG, Germany
Duration: 2000 hrs+ Ongoing (UG NX & Team Center)--
Project Engineer 11/2004 - 03/2012
Inteva Products (Formerly ArvinMeritor Inc), Bangalore., Bangalore, Karnataka India
Involved in Automotive Products Design, 3D modeling, assembly,
Manufacturing drawing creation, RFQ’s for OEMs, Design Reviews with COEs, Core
Engineering activities and PLM activities, Design Release, APQP (C2C), PPAP, DFM, DFA,
DFMEA, Problem solving, project-management for different types of Window Regulators
and its parts (Sheet metal & Plastic components), DC Motors for Window regulators using
CATIA V4 & CATIA V5.
Involved in Packaging study of WR assembly, Design modifications, Complete
designing of a plastic Glass holder (Critical part) with molding feasibility study for
BMW X3 SUV car.
Duration: 1200 hrs (CATIA V4/V5)
Client: BMW, Germany
? Involved in Daimler BR222 Cable Guidance Concept Design for Limousine &
Coupe.
Duration: 700 hrs (CATIA V5)
Client: DAIMLER, Germany
? Involved in Packaging study of WR assembly, Design & Drawing modifications for
VW RPU, VW 350, VW Touareg Cursor Design, VW new concept cursor.
Duration: 1000 hrs (CATIA V5)
Client: VW, Germany
? Involved in RFQ’s (WR Concept) for M&M Scorpio export market (US),Nissan
X11M,DPCA (PSA China) TX3,DPCA BX3.Nature of work involved in
understanding of SOR, creation of WR concept design, review with COE, Creation
of BOM, OEM interactions, Co-ordination between Industrialization, Supplier
development teams etc.
Duration: 2000 hrs (CATIA V4/V5)
Clients: M&M-India, Nissan-India, DPCA (PSA)-China
? Supported Design & Development of Front & Rear WRs for Ford B517 (Ford Figo)
on need basis. Involved in 3D & Dwg modifications, PLM activities, DFMEA for
Individual components & WR assembly.
Duration: 300 hrs (CATIA V4/V5)
Client: Ford, India
? Involved in Front and Rear door Complete Window regulator Design, production
drawing creation for Chinese Car.
Duration: 2000 hrs (CATIA V4)
Client: BAC (BMW + CAC JV), China
? Design of an Assembly line conveyor to move different types of motors from one
place to another. Benchmarking & Reverse engineering of Denso Motor.
Duration: 500 hrs. (CATIA V4)
Client: Arvin Meritor, Esson (France)
? Involved in Creation of Generic Technical specifications for different Parts/Sub
assemblies/Assemblies of WR. Some of these GTS comprises Functional
Analysis, DFMEA, DVP & Alternative Materials Region wise for RFQs
etc..are approved by ArvinMeritor Core Engineering department (France), released
in PLM for usage to ARM world wide.
Duration: 1000 + hrs .
Client: Arvin Meritor, France
? Worked on Ford B562 project on Rear Window regulator Design (Power &
Manual).
Core Competencies in Window Regulator Design
? Glass Drop Kinematics methodology.
? Glass Equilibrium Analysis.
? Window Regulator Design & Packaging.
? Design Validations by testing.
? Provided Window Regulator Training for Plant Engineers for 3 Days.
? TS 16949 Engineering Representative.--
Associate Design Engineer 07/2002 - 11/2004
Shri Padmavathi Consultants, Bangalore, Karnataka India
Cad Conversion and Remodeling using CATIA V4 & V5, Nature of work
involved Part modeling, Surface modeling, Drafting and Detailing, Assembly of different
types of connectors, Plug housings, Terminal Contacts, Welding Fixtures etc
Modeling, Drafting and Detailing of different types of Plug Housings Ex: 12 Position
plug Housing, 32 Position plug Housing etc..
Duration: 3000hrs. (CATIA V4)
Clients: DaimlerChrysler, Volkswagen, PSA, Renault
? Modeling, Drafting and Detailing of different types of Terminal Contacts..
Duration: 500hrs. (CATIA V4)
Clients: DaimlerChrysler, Volkswagen, PSA, Renault
? Drafting and Detailing of Welding fixture Assemblies (BIW Fixtures).
Duration: 500 hrs (CATIA V4)
Client: Daimler Chrysler/Kuka/Comau (Italy)
? Surface modeling of Steering wheel
Duration: 50 hrs (CATIA V5)
Client: AutoLiv--
Visveswaraiah Technological University 07/1998 - 07/2002
Mysore, Karnataka, India
Degree: Bachelor's Degree
Major:Mechanical Engineering
Completed Bachelor's Degree of Mechanical Engineering with "First class with Distinction"